
A ground-up, three-story, 130,000-square-foot climate-controlled storage facility in North Myrtle Beach, SC, built with cold-formed metal framing, concrete decks on the upper floors and a well-appointed EIFS exterior with brick and glass. McDowell managed the overall project; site work, landscaping and building supply were outside its contract.